NEW QUESTION # 20
Which three RAID configurations are supported by VSP Midrange systems? (Choose three.)

  • A. 7D + 1P
  • B. 4D + 1P
  • C. 10D + 2P
  • D. 8D + 1P
  • E. 2D + 2D

Answer: B,C,D


NEW QUESTION # 21
Which tool do you use to install license keys on a VSP G370 system?

  • A. Storage Navigator
  • B. HSA Embedded
  • C. MPC Software
  • D. Maintenance Utility

Answer: D


NEW QUESTION # 22
Which manual should be used when performing maintenance actions on VSP midrange storage systems?

  • A. Product Documentation Library
  • B. Service Guide
  • C. Administrator Guide
  • D. Maintenance Manual

Answer: D


NEW QUESTION # 23
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?

  • A. two BM35 per controller
  • B. two BM35 per system
  • C. two BM45 per controller
  • D. one BM45 per controller

Answer: C


NEW QUESTION # 24
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?

  • A. Use the Maintenance Utility for blocking the controller, then replace the PS.
  • B. Use the Maintenance Utility for blocking the PS, then replace it.
  • C. Check if the status of the PS is blocked, and if yes, then replace it directly.
  • D. Use the MPC for blocking the PS, then replace it.

Answer: D


NEW QUESTION # 25
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

  • A. Create a Host Group.
  • B. Enable Host Group security.
  • C. Scan for all WWNs.
  • D. Enable Port Security.

Answer: C


NEW QUESTION # 26
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

  • A. The RAID 5 group must be put into DRU mode in Storage Navigator.
  • B. The RAID level in the SVP Maintenance window must be changed.
  • C. Parity groups must be deleted.
  • D. The RAID level must be changed in Storage Navigator.

Answer: C


NEW QUESTION # 27
You need to upgrade the firmware on a VSP G700.
Which file must you select to perform the upgrade using the Maintenance Utility?

  • A. HA-SVP-xx.iso
  • B. All Firmware.mda
  • C. HA-MPC-xx.iso
  • D. setup.exe

Answer: A


NEW QUESTION # 28
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?

  • A. 2.99 TB
  • B. 1 TB
  • C. 65 TB
  • D. 128 TB

Answer: A


NEW QUESTION # 29
How many batteries does a VSP E1090 have per controller (CTL)?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 30
Which program is used to perform the "New Installation" procedure on a VSP F700 system?

  • A. Hitachi Ops Center Administrator
  • B. raidcom CLI
  • C. SVP Web console
  • D. MPC connected to the maintenance LAN port

Answer: A


NEW QUESTION # 31
Which two statements are correct when adding cache to a VSP E590? (Choose two.)

  • A. This is not supported online.
  • B. Cache Modules must be installed on the CM board.
  • C. CMG0 and CMG1 must have the same DIMM type.
  • D. Cache modules must be installed in CMG1.

Answer: C,D


NEW QUESTION # 32
What are two functions of the LAN Blade in the VSP Midrange family? (Choose two.)

  • A. It provides the management port connecting to the customer LAN.
  • B. It provides the maintenance port connecting to the MPC.
  • C. It provides the LAN connection to the file module.
  • D. It provides the iSCSI connection to the servers.

Answer: A,C


NEW QUESTION # 33
The SVP of a VSP G900 system failed and you have been asked to replace it.
Which two items must be available to perform the replacement? (Choose two.)

  • A. the microcode iso file with the correct software versions
  • B. the iso file with the correct version of the Windows operating system
  • C. the iso file with the correct version of Hitachi Ops Center
  • D. the Hitachi Remote Ops Monitor Agent iso file

Answer: A,C